Educational

Return to project list
Project Specs
Completion date:

2007/2008

Size:

51,000 sq ft

Budget:

$11.59 Million

Carberry Collegiate

This 48,000 SF project consisted of a multi-phased addition/renovation to a grade 6-12 school and daycare centre to allow the existing school to remain operational throughout construction.  The school was also designed to achieve Public School Finance Board energy reduction requirements and Manitoba Hydro Power Smart Standards.

Phase 1: consisted of a two-storey classroom block into which existing students were decanted prior to the start of Phase 2.

Phase 2: involved the expansion of: the schools education spaces (the library, Multi-purpose Room, Administration, Industrial Arts and Home Economics); a Daycare; bus loop and a partial renovation of an existing gym.

The centrally located library resource centre and the multi-purpose room which are the major gathering spaces in the school are the nucleus around which the entire school is organized.