In Progress

Return to project list
Project Specs
Completion date:

2019

Size:

96,000 sq ft

Budget:

$24 M

Winnipeg Airport Authority – Ground Support Equipment Facility

The new GSE building is a one storey facility bridging the primary security line supporting groundside access and airside apron support adjacent to the main terminal building. The building stretches 750 feet in length housing multiple tenants with immediate access and adjacency to airside operations within the airport campus. The building was designed as a pre-engineered steel structure with 100 feet clear span depth in the tenant spaces and 30 feet clear height to provide tenant flexibility for growth and adaptation together with the airport campus. The building has a high performance and energy efficient envelope coupled with continuous clerestory lighting running the full length of the building on both groundside and airside flooding interior tenant spaces with natural light and providing windows to future mezzanine and second levels.